Developers
Test whether a Flood Zone 3 layout has a plausible compensation route before the FRA.
Flood application
Compare existing and proposed ground against a screening flood level, band by band, before the full FRA design is fixed.
From £149Scoped to the site
Request a compensation screenDesigned for decisions
Test whether a Flood Zone 3 layout has a plausible compensation route before the FRA.
Move platforms, voids and compensation areas while the layout is still flexible.
Generate a reproducible screening ledger before modelled WSE work and sign-off.
Product contents
Displaced, provided and net volume in each depth band below the flood level.
A clear screening pass or shortfall for every level band, not just a total volume.
Mapped evidence showing the existing and proposed floodplain surfaces.
A clear escalation path where modelled water levels or an engineer-signed scheme are required.
Start with the evidence
Practical detail
Not by itself. The screening output tests feasibility. Submission-grade work needs the modelled water surface, detailed design and engineer sign-off.
Simple screening planes fit the entry price. Complex geometry, multiple options or submission-grade inputs are scoped before work starts.
Ready when you are
From £149 · Scoped to the site
Related products